CM5-LTS accessories

  • Genuine Honeywell MAP for CM5-LTS QUICK VIEW Genuine Honeywell MAP for CM5-LTS $99.00 USD

    Genuine Honeywell MAP for CM5-LTS

    $99.00 USD

    Genuine Honeywell Absolute Pressure Sensor Kit Option Includes: 50PSI or 100PSI Absolute Pressure Brass-Body Sensor with a 1/8" NPT Male Thread Brass barbed hose fitting for 3/16" (4.76mm) ID Vacuum Hose...
    View full product details →
  • Fused Power/Ground Kit for CM5-LTS QUICK VIEW Fused Power/Ground Kit for CM5-LTS $29.00 USD

    Fused Power/Ground Kit for CM5-LTS

    $29.00 USD

    Kit Option Includes: Genuine Littelfuse automotive JCASE fuse holder with 10AWG (5.0mm^2) wires Genuine Littelfuse automotive 40A fuse (low profile) Genuine TE Connectivity PIDG Ring Terminals (2x M6, 1x M5 and 1x...
    View full product details →
  • Auxiliary Pump Harness for CM5-LTS QUICK VIEW Auxiliary Pump Harness for CM5-LTS $29.00 USD

    Auxiliary Pump Harness for CM5-LTS

    $29.00 USD

    Supplied with 2 Blue Molex/TE PermaSeal/DuraSeal 16-14AWG wire splices (not shown) Length: 14ft (425cm)Wire: 14AWG Automotive SXL Wire
    View full product details →
  • I/O Expansion Module for CM5-LTS QUICK VIEW I/O Expansion Module for CM5-LTS $99.00 USD

    I/O Expansion Module for CM5-LTS

    $99.00 USD

    This module plugs into the CM5-LTS wiring and breaks out the following optional signals: CANBus Dash-Mounted LCD Display or Gauge Analog A and B 0-5V Inputs Torqbyte A and B...
    View full product details →

Connect With Us

Latest Posts

  • Using the Factory BMW T/MAP Sensors with the CM5-LTS

    In most BMW applications with a CM5-LTS WMI controller, it is preferred to obtain boost readings by "teeing" into the factory TMAP sensor wiring. Below is the information on how to do this for several popular BMW TMAPs we have... Read more →

  • GPO - Generic Boost Cut Strategy

    CM5 and CM5-LT are able implement 3 water methanol safety approaches and take action to cut boost whenever system trouble is detected in order to save the engine from overboost. The 3 safety approaches are: Approach 1: Activate one of the two... Read more →

  • GPO - Relay Control

    CM5 and CM5-LT are equipped with two, pull-to-ground, General Purpose Outputs, GPO1 and GPO2 that can each be configured to switch ON or OFF either ABOVE or BELOW some setpoint. This setpoint is a combination of engine RPM and either... Read more →